HPP Mrsovo

 

Hydro Power Plant Mrsovo, Comsar's new hydropower facility, will provide clean and renewable power for the region. The run-on-river hydro power plant will have installed capacity of 36,8MW and will come online in 2019.

In September 2012, a preliminary design and feasibility study was undertaken by IK Consulting and Design Ltd, Belgrade, based on previous reports. The main aim was to locate all facilities of the system (the dam and accompanying buildings and reservoir) on Republic of Srpska territory so it would not in any way affect the natural border with the Republic of Serbia.

© Comsar Energy Group 2013

Site design : pgabranding.com