REALISING OUR VISION

 

Comsar Energy Republika Srpska (CERS) has been scrupulous in our efforts to measure, analyse, produce studies, and follow permit issuance procedures necessary to fulfill of the requirements for the construction and operation of the Ugljevik 3 Power Plant.

  1. Justifiability study - Realization of the Ugljevik 3 TPP New Blocks Project (IG, Trebinje)
  2. Expert opinion and urban planning & technical terms to be fulfilled within the frame of the new Ugljevik 3 TPP block construction (Planing BL, Banja Luka)
  3. Expert opinion and urban planning & technical terms to be fulfilled within the frame of the new Ugljevik 3 TPP block construction (Projekt, Banja Luka)
  4. Simplified mining project on mass storage VZO PK Bogutovo Selo (Mining Institute, Prijedor)
  5. Geotechnical studies needed for the construction of the Ugljevik 3 TPP (Technical Institute, Bijeljina)
  6. Study on the provision of raw water serving the needs of the Ugljevik 3 TPP (IPIN, Bijeljina)
  7. Environmental Impact Study addressing the new Ugljevik 3 TPP blocks (Projekt, Banja Luka)
  8. Nostrification of technical documentation prepared within the frame of the Ugljevik 3 TPP Project (Projekt, Banja Luka)
  9. Fire protection study required for the construction of the Ugljevik 3 TPP (Projekt, Banja Luka)
  10. Transportation study addressing the transport of TPP Ugljevik overall equipment (Cobra trans Zagreb, Zagrebački Maunt Zagreb and Ciambella export-import Banja Luka)
  11. Hydro-meteorological information study

Activities related to the construction of the campus accommodating workers 

  1. Urban planning and technical terms to be fulfilled with the construction and reconstruction of new and existing facilities respectively within the campus perimeter, hosted by the new Ugljevik 3 TPP block located in Ugljevik (Planing BL, Banja Luka)
  2. Design of the supporting walls to be constructed at the Ugljevik 3 TPP campus site (INK construktor BL)

In addition to the aforementioned documents, CERS has obtained all necessary permits and decisions, including:

  1. General approval of the location of structures envisioned to be constructed within the Ugljevik 3 TPP block perimeter, number 10-5254EPBIH/11 (ELEKTRO PRENOS BIH) 
  2. Location permits for the construction of residential buildings and supporting facilities within the perimeter of the campus situated within the new Ugljevik 3 TPP, partially occupying the cadastral plot entered into the Cadastral Registry of the Ugljevik Cadastral Municipality, Ugljevik Municipality, under number. 768, entry no 15.02-364-579/11 (THE MINISTRY OF URBAN PLANNING, CONSTRUCTION AND ECOLOGY OF RS)
  3. Decision granting the Investor, Comsar Energy Republic Srpska, the construction of residential buildings and supporting facilities within the perimeter of the campus and the block of the Ugljevik 3 thermal power plant occupying in part the land tagged as the cadastral plot No 768/3 (THE MINISTRY OF URBAN PLANNING, CONSTRUCTION AND ECOLOGY OF RS)
  4. Concession grant for exploring the limestone reservoir Mlađevac, Zvornik Municipality (THE MINISTRY OF INDUSTRY, ENERGY AND MINING RS)
  5. Decision granting the performance of appraisal works as under the Main Design; detailed geological investigation of landfills Delići and Peljave-Tobut near Ugljevik, number 05.07/310-494/11 (THE MINISTRY OF URBAN PLANNING, CONSTRUCTION AND ECOLOGY OF RS)
  6. Concession grant for detailed geological research of the landfill Baljak situated near Ugljevik (THE MINISTRY OF URBAN PLANNING, CONSTRUCTION AND ECOLOGY OF RS)
  7. Location requirements to be met with the construction of the new Ugljevik 3 Thermal Power Plant block, to be situated in Ugljevik, number 15.02-364-85/12 (THE MINISTRY OF URBAN PLANNING, CONSTRUCTION AND ECOLOGY OF RS)

© Comsar Energy Group 2013